Malaysia Road Fuel Cost Estimator

    Batu Pahat Sungai Petani

    How much petrol or diesel does it cost to drive from Batu Pahat to Sungai Petani? Breakdown by vehicle type using today's Malaysia fuel prices, updated from the datasource.

    Distance
    627
    kilometres
    Drive Time
    7h 50m
    highway est.
    Toll
    RM 32.00
    one-way est.
    Lynxo

    Go beyond fuel estimates. Run your whole fleet.

    Fuel & Route Planning

    Live driver tracking
    Fuel cost per trip
    Route optimisation
    Proof of delivery
    Create Route Plan

    No credit card required

    Route map: Batu PahatSungai Petani

    Visualise the route and share the plan with your team, driver, or customer.

    627 km · 7h 50m
    Fleet tracking by Lynxo
    Share this route plan

    Run this route with Lynxo

    Assign a driver, track them live, send the customer a real-time ETA link — all from one dispatch dashboard.

    Start free

    Lynxo in action

    From route plan to delivered — in one system

    Dispatch the driver, track the trip live, and capture proof of delivery — all connected to the route you just planned.

    Dispatch — Live
    Lynxo Dashboard

    Active job

    Batu PahatSungai Petani

    627 km · est. 7h 50m

    A

    Ahmad Al-Rashid

    Van · 3 stops assigned

    En route

    Stops

    Pickup — Batu Pahat depot
    In transit
    Delivery — Sungai Petani
    ETA
    --:-- --
    Distance left
    345 km
    Dispatch like this — free
    Proof of Delivery
    -- --- ----

    Delivered successfully

    Sungai Petani · --:-- --

    Photo evidence

    Parcel at door
    Recipient + package

    Recipient signature

    GPS stampSungai Petani area
    Timestamp-- --- ---- · --:-- --
    ExceptionsNone
    See how POD works

    Running this route for deliveries?

    Batu Pahat to Sungai Petani can become a recurring route cost.

    At 22 one-way trips per month across 3 vehicles, this route is roughly RM 15,975 in fuel and toll cost before driver time, failed deliveries, and rerouting.

    Monthly route scenario
    RM 15,975
    3 vehicles · 22 trips/month
    Build this route plan

    Lynxo

    Create a delivery plan for Batu Pahat to Sungai Petani.

    Keep the distance, fuel, and toll estimate on this page, then use Lynxo when this route becomes recurring delivery work.

    Delivery Time & ETA: Batu Pahat to Sungai Petani

    How long the trip takes — and what it means for same-day vs. next-day delivery planning.

    One-way drive time
    7h 50m

    Normal highway conditions, excl. loading

    Round trip
    15h 40m

    Driving only, before stop time

    Distance
    627 km

    Highway routing

    For delivery planning, at 7h 50m one-way, same-day delivery is achievable but the round trip exceeds a single driver shift, so plan an early dispatch or a driver relay. These are estimates — real ETAs shift with traffic, checkpoints, and multi-stop detours. Live GPS tracking & route monitoring shows actual vehicle progress and customer-facing ETAs instead of a fixed guess.

    Customise Your Cost Estimate

    Adjust mileage, fuel type, and trip frequency to match your actual vehicle and schedule.

    12 km/L
    4 km/L (lorry)50 km/L (motorcycle)
    22×
    1
    1 driver50 drivers

    Your estimate

    One-way cost (RON 95 + toll)
    RM 242.04
    22 trips/month
    RM 5,325
    total monthly fuel cost
    Save this route cost plan →

    No credit card required

    Fuel Cost by Vehicle Type

    Select your vehicle to see the detailed fuel breakdown for this route. Prices as of 10 September 2026.

    Motorcycle
    Kapchai / Underbone
    Avg mileage
    40 km/L
    Fuel needed
    15.7 L
    RON 95
    One-way fuel cost
    RM 63.01
    excl. toll
    One-way fuel + tollRM 95.01
    Round trip fuelRM 126.03
    Round trip fuel + tollRM 190.03
    By fuel type (one-way)
    RON 95: RM 63.01
    RON 97: RM 70.54
    Suitable for solo dispatch or last-mile
    Car / SUV
    Sedan, MPV, SUV
    Avg mileage
    12 km/L
    Fuel needed
    52.3 L
    RON 95
    One-way fuel cost
    RM 210.04
    excl. toll
    One-way fuel + tollRM 242.04
    Round trip fuelRM 420.09
    Round trip fuel + tollRM 484.09
    By fuel type (one-way)
    RON 95: RM 210.04
    RON 97: RM 235.13
    Courier, sales, and small parcel delivery
    Van / MPV
    Cargo van, 1-ton van
    Avg mileage
    9 km/L
    Fuel needed
    69.7 L
    Diesel
    One-way fuel cost
    RM 342.76
    excl. toll
    One-way fuel + tollRM 374.76
    Round trip fuelRM 685.52
    Round trip fuel + tollRM 749.52
    By fuel type (one-way)
    RON 95: RM 280.06
    Diesel: RM 342.76
    Mid-volume delivery and food distribution
    Lorry
    3-ton, 5-ton, 10-ton
    Avg mileage
    5 km/L
    Fuel needed
    125.4 L
    Diesel
    One-way fuel cost
    RM 616.97
    excl. toll
    One-way fuel + tollRM 648.97
    Round trip fuelRM 1233.94
    Round trip fuel + tollRM 1297.94
    Bulk freight, FMCG, and logistics hauls

    Monthly Fleet Fuel Cost

    Running this route regularly? Estimated one-way fuel cost per month, by trip frequency. Figures use primary fuel for each vehicle type (toll excluded).

    Vehicle1×/month5×/month10×/month22×/month
    Motorcycle
    RON 95
    RM 63RM 315RM 630RM 1,386
    Car / SUV
    RON 95
    RM 210RM 1,050RM 2,100RM 4,621
    Van / MPV
    Diesel
    RM 343RM 1,714RM 3,428RM 7,541
    Lorry
    Diesel
    RM 617RM 3,085RM 6,170RM 13,573

    Add RM 32.00 toll per one-way trip to get total trip cost per journey.

    Full Fuel Cost Comparison

    All vehicle types × all fuel types for this route.

    Vehiclekm/LRON 95RON 97DieselFuel + Toll
    Motorcycle40RM 63.01RM 70.54RM 95.01
    Car / SUV12RM 210.04RM 235.13RM 242.04
    Van / MPV9RM 280.06RM 342.76RM 374.76
    Lorry5RM 616.97RM 648.97

    "Fuel + Toll" uses the primary fuel type for each vehicle. Toll is one-way estimate.

    Today's Fuel Prices in Malaysia

    official Malaysia fuel price announcements used in all calculations above

    Standard petrol
    RM 4.02
    RON 95
    Cars, motorcycles, vans
    Premium petrol
    RM 4.50
    RON 97
    Performance vehicles
    Euro 5 diesel
    RM 4.92
    Diesel
    Lorries, vans, 4x4s

    Last updated: 10 September 2026. Prices are sourced from official Malaysia fuel price announcements.

    Lynxo

    Running Batu Pahat to Sungai Petani for deliveries?

    Use Lynxo to dispatch the route, track drivers, monitor fuel and toll cost, and keep proof of delivery in one workflow.

    Live route and fuel planning
    Driver tracking and dispatch control
    Proof of delivery and exception recovery

    Product demos

    See Lynxo in action

    View all →

    Common Questions: Batu Pahat to Sungai Petani

    How far is Batu Pahat to Sungai Petani?

    The highway distance from Batu Pahat to Sungai Petani is approximately 627 km. The estimated driving time is 7h 50m under normal highway conditions.

    How long does delivery take from Batu Pahat to Sungai Petani?

    Plan for roughly 7h 50m of one-way transit time plus loading and handling at each end. In practice, at 7h 50m one-way, same-day delivery is achievable but the round trip exceeds a single driver shift, so plan an early dispatch or a driver relay. Real ETAs vary with traffic, checkpoint or border delays, and multi-stop detours — which is why delivery operators track vehicles live rather than rely on a fixed estimate.

    How much petrol does a car use from Batu Pahat to Sungai Petani?

    A typical car with 12 km/L mileage uses approximately 52.3 litres of petrol. At today's RON 95 price (RM 4.02/L), that costs RM 210.04.

    How much does a lorry spend on diesel from Batu Pahat to Sungai Petani?

    A lorry averaging 5 km/L needs about 125.4 litres of diesel for this route. At RM 4.92/L, the fuel cost is RM 616.97 one-way.

    What is the toll charge from Batu Pahat to Sungai Petani?

    The estimated one-way toll on this highway route is approximately RM 32.00. Toll estimates are calculated from PLUS highway rates. Actual charges vary by specific highway and entry/exit points.

    How much does a motorcycle spend on fuel from Batu Pahat to Sungai Petani?

    A motorcycle averaging 40 km/L uses about 15.7 litres. At today's RON 95 price, that's RM 63.01, making it the most fuel-efficient option for this route.

    What is the total cost (fuel + toll) for a delivery van on this route?

    A delivery van using diesel at 9 km/L needs 69.7 litres, costing RM 342.76 in fuel. Add the RM 32.00 toll for a total one-way cost of approximately RM 374.76.

    For Fleet Operators

    Managing a fleet? Track fuel costs across all your routes.

    Lynxo helps logistics companies and delivery operations plan routes, track drivers, and monitor per-trip costs, so every route cost is accounted for.

    Also explore: Courier management · Last-mile delivery · Delivery management · GPS tracking

    Turn this into a live dispatch job

    Add stops, optimise the route, assign a driver — then share the plan. All from here.